Define the loss
Choose a recurring, measurable operational problem with a meaningful cost or capacity consequence.
The pilot structure is designed to reduce commercial and technical risk before a wider deployment. One bounded loss mechanism, explicit assumptions, traceable evidence and a clear decision gate — before any wider rollout is considered.
The exact scope depends on data access and operational context. This is the proposed engagement structure for a future pilot, not a claim that a standard commercial programme is already generally available.
Choose a recurring, measurable operational problem with a meaningful cost or capacity consequence.
Document the value model, data quality, assumptions and what “recovered” will mean.
Connect operating signals, events and context into an inspectable evidence chain.
Prioritise the engineering action while keeping expert judgement in control.
Compare before and after, distinguish correlation from stronger evidence and quantify the observed change.
Use the result to make a rational next-step decision rather than assuming rollout.
Expected outputs are a documented evidence chain, explicit confidence and assumptions, an agreed value model, a prioritised action and a before/after verification route.
Discuss a Candidate Problem